AUG 2026
POSITIONING
Defined apmatus.com as a public personal AI build journal. The goal shifted toward documenting real projects, decisions, failures, and lessons rather than presenting unvalidated business verticals.
AUG 2026
SITE REVIEW
Reviewed the rough site already in place. Chose to refine it instead of rebuilding from scratch. Identified missing links, unfinished forms, project page gaps, and the need for stronger project documentation.
SEP 2026
RELEASE
Prepared the first GoDaddy ready static release package with 12 HTML pages, including early project pages that were later retired from navigation, plus legal pages, forms, metadata, robots.txt, sitemap.xml, and a custom 404 page.
SEP 2026
GODADDY
Backed up the prior WordPress files and database, deployed the static site through GoDaddy and cPanel, and worked through hosting and AutoSSL changes needed to support HTTPS.
SEP 2026
LIVE QA
Verified HTTPS redirect, Formspree form wiring, desktop behavior, and mobile layout. Corrected mobile project card visibility, LinkedIn call to action alignment, footer alignment, and remaining live routing issues.
SEP 2026
SEARCH
Checked Google Search Console after the homepage initially appeared unknown to Google. Submitted the sitemap, confirmed discovery of site URLs, and reviewed robots rules, canonical URLs, metadata, and structured data.
SEP 2026
DISCOVERABILITY
Expanded the audit beyond traditional SEO to AI and search discoverability. Reviewed the architecture around Projects, Field Notes, Insights, and indexable project pages.
SEP 2026
INTERACTION
Kept the homepage IDE concept and moved toward a restrained rotating console that shows project questions, decisions, and status instead of decorative code.
OCT 2026
POSITIONING
Reworked the homepage so the site presents an experienced operations professional applying AI, without implying consulting availability, entrepreneurship, or maturity the projects have not earned.
OCT 2026
GOVERNANCE
Added risk and controls to the project documentation standard. Project language now includes Question, Assumption, Risk, Evidence, Decision, Lesson, and Next.
OCT 2026
STRUCTURE
Merged decisions into their related projects, separated Field Notes from Insights, kept the Build Log as the chronology, and removed repeated sections that described apmatus.com as a project more than once.
OCT 2026
NEXT PROJECT
Selected the AI Project Agent as Project 02. The build has not started. Scope, boundaries, controls, and success measures come first.
OCT 2026
PREDEPLOY QA
Completed the final code level review of the approved homepage direction. Corrected the About section sequence and checked internal anchors, unique IDs, JavaScript syntax, mobile breakpoints, navigation behavior, external link safety, image alt text, typography hierarchy, and article page links.
OCT 2026
DEPLOYMENT
Deployed the revised homepage and Insights to production, standardized LinkedIn and X links, and began live desktop and mobile review against the approved positioning and structure.
OCT 2026
MOBILE QA
Live review exposed small but visible presentation issues in the hero actions, project language row, About profile sequence, and footer. Those issues moved into the final cleanup rather than being accepted as finished.
NEXT
CLOSEOUT
Submit both forms end to end, confirm the remaining technical checks, then record the deployment as verified and shift primary attention to Project 02.